THE DECISION LAYER

Measurement Exists to Decide:
Which Accounts. Which Plays. Which Spend.

B2B attribution is probabilistic. We don’t promise a perfect ROI number—we build a system that reduces uncertainty for your highest-leverage decisions. If Play A lifts Evaluate→Validate by +18% in Manufacturing but not SaaS, we reallocate spend next week, not next quarter.

PLATFORM ON (6sense / Demandbase)
  • Standardize cohorts + stage definitions
  • Operationalize platform intent into CRM actions
PLATFORM OFF (CRM / MAP First)
  • Implement the measurement layer in your stack
  • Build the field contracts required for ABM scale

The End of Attribution Theater

Attribution theater is credit-based reporting that doesn’t change a decision. In complex cycles, we measure lift against a baseline so you can reallocate spend with confidence.

Credit-Based Outputs
  • Impressions and clicks
  • First-touch charts
  • “Influenced pipeline”
Decision-Ready Outputs
  • Stage conversion delta
  • Median days-in-stage
  • Committee role coverage

// DECISION_CONFIDENCE_DASHBOARD

Evaluate → Validate+18% Lift
Validate → Commit+12% Lift
Median Days-in-Stage42 (-12d)
Decision ConfidenceHIGH

Measurement That Ships (Not Slides)

DECISION_ARTIFACT_01

Control Groups + Exposure Rules

Includes suppression logic and cohort definitions to keep lift defensible even when attribution is probabilistic.

VIEW PROTOCOL →
DECISION_ARTIFACT_02

Stage SLA + Cycle-Time Metrics

Track median and distribution days-in-stage to prove cycle compression without averaging away reality.

VIEW PROTOCOL →
DECISION_ARTIFACT_03

Committee Coverage + Role Penetration

Measure engaged personas per account and role coverage to reduce single-thread deal risk.

VIEW PROTOCOL →
DECISION_ARTIFACT_04

Play Versioning + Release Notes

Includes changelog templates and naming conventions so performance ties to specific system decisions.

VIEW PROTOCOL →
DECISION_ARTIFACT_05

Measurement Data Contract

Includes required fields and CRM writeback specs so signals stay comparable across your entire stack.

VIEW PROTOCOL →

The Weekly Operating Rhythm

Weekly DecisionMetricOperating Action
Which play gets more budget?Win-rate / stage liftScale winners
When will this cohort convert?Median velocitySet realistic SLAs
Will SDRs actually run this?Acceptance rateFix payload rules

Stop Chasing Credit.
Start Making Better Decisions.